Dumpsters overflowing with lumber are merely a symptom. To really reduce lumber waste on your jobsites, you need to address your systems

Dumpsters overflowing with lumber are merely a symptom. To really reduce lumber waste on your jobsites, you need to address your systems

To reduce lumber waste, you have to go well beyond mere scraps. While a dumpster full of “scrap” lumber is the most visible example of waste, its impact is far greater if you consider the money spent on excess lumber ultimately not needed for construction—especially given the volatility of materials costs today.

Excess wood is less visible, so it’s often overlooked. But making it a priority will save money, time, and effort while reducing hauls to the landfill. The secret is to be mindful of how you frame certain details, how you order lumber, and how that lumber shows up on site. Here’s how.

We’ve covered optimum value engineering (OVE, aka advanced framing) in this column before, but the techniques always bear repeating as an effective way to reduce lumber use, among other benefits.

Simply, OVE places rafters, joists, and 2-by-6 studs 24 inches on center and vertically aligns framing members to create direct load paths from roof ridges to footings, eliminating the need for double plates and reducing the number of load-bearing window and door headers. All told, using OVE can save about $1,000 in lumber costs for a 2,400-square-foot house, and can help builders complete it in less time, saving additional costs.

Even so, few builders fully embrace this approach and still use 2-by-4s at 16 inches on center. But the beauty of OVE is you can adopt certain aspects of it and still benefit. For instance, I see more of our builder clients using three-stud “California” corners to reduce lumber in that area of the frame. A good next step would be insulated headers, which replace a layer of lumber with rigid foam insulation (which also reduces thermal bridging through the header), and reduces the number of jack studs and cripples around the window opening (see illustration, below). It goes without saying that the structural designer needs to approve the change, but since OVE is a well-documented and proven method, that’s not usually a problem.

I’ve seen plenty of framing lumber that wasn’t properly optimized arrive at the jobsite—a big reason why builders average a 15% waste factor on their framing jobs.

Say, for example, that the roof of a small porch will need 10 2-by-6 rafters, each 7 feet long. If you order 8-footers and cut 1 foot off each one, you’ll end up with 10 feet of 1-foot scraps. But if you order five 14-footers and cut them in half, there is zero waste.

Optimizing lumber lengths for an entire home will require some effort by the estimator, but most production companies build a handful of designs multiple times, which results in economies of scale whereby the rewards will be multiplied—as will the costs of continuing to ignore the inefficiency of wasted lumber.

For the estimators to properly optimize lumber, they need feedback from the jobsite.

In many cases, I’ve seen take-offs include 10 more sheets of OSB than the job requires. While some of that OSB may ultimately get returned to the supplier, much of it just clutters the site, ends up damaged and in the dumpster, or “disappears” in the back of a pickup truck. Instead, the site supervisor should confirm the required number of OSB sheets with the framers and then align with the estimator for the take-off. That extra bit of communication will result in a significant return.

None of these steps is difficult, and everyone wins in the end. Real cost savings, less clutter and cleanup, and fewer materials returns are just a few of the benefits. You may even find it motivates you to find more ways to save.  

Andrew Shipp drives quality and performance in home building as a building performance specialist on the PERFORM Builder Solutions team at IBACOS.

Home builders generally do a good job with blown-in-place attic insulation but should take care with these common trouble spots to ensure a better insulation job and greater home energy efficiency

Do you want workers to take jobsite safety seriously? Then don’t overcomplicate it

Transitions where horizontal and vertical stucco surfaces intersect are prone to moisture problems. Attention to proper detailing will help you avoid issues with water intrusion

COVID-19 may be easing its grip on the U.S. after a disastrous two years, but lingering supply chain disruptions have builders holding onto their pandemic business tactics

If you're running a home building company and believe numbers equal truth, think again. Numbers do, in fact, lie. But there are ways to achieve more reliable business metrics

Don’t let the current hype about single-family B2R communities obscure the need to create long-term sustainability and asset value

NAHB’s Housing Developments podcast explores potential solutions for a frenzied post-pandemic business environment

By creating an account, you agree to Pro Builder's terms of service and privacy policy.

Each day, Pro Builder's editors assemble the latest breaking industry news, hottest trends, and most relevant research, delivered to your inbox.

Lorem ipsum dolor sit amet lorem ipsum dolor sit amet lorem ipsum dolor sit amet.

Pro Builder is an advertisting supported site and we noticed you have ad-blocking enabled in your browser. There are two ways you can keep reading:

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

You’ve read 2 premium stories this month. Subscribe for unlimited access.

Get Pro Builder in your inbox. Sign up today!